SCAFFOLDING PLACEMENT

CLIENT

The client specialises in providing temporary works solutions, including 3D modeling of scaffolding systems. They utilise a product called Quick Stage, which adheres to strict engineering rules.

CHALLENGE

The client encountered a time-consuming challenge in constructing a scaffolding system, with the manual process taking 4 to 5 days to model a system for a residential complex. They sought an automated solution that would adhere to the engineering rules and requirements of their product, Quick Stage.

HOW AUTONOMATION SOLVED IT

AUTONOMATION developed an intuitive, automated solution. By simply drawing a line where the scaffolding system was needed, the system would automatically generate the scaffolding in compliance with all engineering rules. The solution was seamlessly integrated into their existing workflow, allowing for manual adjustments if necessary.

CLIENT OUTCOME SUCCESS

The solution drastically cut down the modeling time for the scaffolding system from 4 to 5 days to just a few hours. This efficiency allowed the client to model the scaffolding even before securing a project, thereby enhancing their bid proposals. The automation tools shifted the project teams’ focus to production, improving the accuracy of their work. Once a project was won, they only needed to fine-tune the documentation and engineering, as the majority of the work was already completed. This not only transformed their business operations but also increased the value of their offerings.

Solution highlights

  • Automated solution that generated scaffolding systems based on engineering rules.

  • Simple user modelling process by drawing a line where the scaffolding system was needed.

  • Cut down modeling time from 5 days to just a few hours